Welcome to the United Kingdom Website

We have detected that you may prefer the Global site. Please use the language dropdown above to change your selection if required.

Go to Global

Managing Temperature Recovery and Preventing Overshoot on a Furnace with Controller Limitations

A success story from the field:, as received from Ross Lumbert, president of American Control & Engineering Service.

“We had a furnace that took too long to operate due to controller limitations. If the furnace was opened at operating temperature for loading the recovery overshot 60 degrees.

“The plant had learned that it had to cool down the furnace before inserting the parts so that the old controller could control the temperature during recovery. This wasted valuable production time. We installed a 3504 and designed a software solution in the 3504 that allowed us to manage the temperature recovery and prevent overshoot without cooling the furnace down before loading. Thus allowing greater production throughput.

Get the most from your process

12 Key Changes from AMS2750D to AMS2750E

Why Eurotherm Materials Processing Solutions?

> Discover our Heat Treatment solutions today

Nadcap compliance statement for Eurotherm products

Eurotherm Heat Treat Solutions with Peter Sherwin

Product Selector

Package icon
Need help choosing the right product?

Our tool will match the best product to your needs

Launch product selector

Contact Us

close
close